Toro Energy Limited (ASX:TOE) Commences 2012 Drilling at Theseus Uranium Project WA
Toro Energy Limited (ASX:TOE) is pleased to announce the start of its 2012 drilling program at its 100% owned Theseus Uranium Project in WA.
Toro Energy Limited (ASX:TOE) is pleased to announce the start of its 2012 drilling program at its 100% owned Theseus Uranium Project in WA.
Indochine Mining Limited (ASX:IDC) is pleased to provide its Quarterly Activity Report for the quarter ended 31 March 2012.
Venus Metals Corporation Limited (ASX:VMC) exploration activities conducted during the quarter ending 31 March 2012 includes soil sampling and assaying at Yalgoo Iron Ore Project, assaying of RC chip and soil samples at Bassit Bore Prospect, reconnaissance RAB drilling programme at Yarloo Well and preparation for processing diamondiferous alluvial gravels at Smoke Creek.
Toro Energy Limited (ASX:TOE) is pleased to provide its Quarterly Activity Report for the quarter ended 31 March 2012.
First assay results confirm high grade gold/silver assays in the first two holes of 23 holes drilled at Indochine Mining Limited (ASX:IDC) major gold/silver project at Mt Kare, in Papua New Guinea (PNG).
Indochine Mining (ASX:IDC) is nearing completion of the first phase of large diameter core drilling ( ~3200m) with 19 holes completed and 3 holes underway for 2450 metres to date on its Mt Kare gold/silver project in Papua New Guinea (PNG).
Indochine Mining Limited (ASX:IDC) was presented with the 'Discovery of the Year' award at the inaugural Asia Mining Awards at a gala dinner at the conclusion to this year's Mines and Money Asia Conference in Hong Kong last week.