
Iron Road Limited (ASX:IRD) Stage 5 Drilling At Central Eyre Iron Project Proceeding To Plan
Perth, Sep 28, 2010 AEST (ABN Newswire) - Iron Road Limited (
ASX:IRD) is pleased to advise that Stage 5 drilling at the Central Eyre Iron Project (CEIP) is proceeding to plan.
Central Eyre Iron Project
CEIP Summary
- Three diamond rigs continue drilling at the Murphy South target area.
- To date 43 RC pre-collar and 19 diamond holes have been completed.
Progress for Period-------------------------------------------------------------Hole Type Metres Completed(m) Holes Completed(No.) -------------------------------------------- PERIOD TO DATE PERIOD TO DATE-------------------------------------------------------------RC (pre-collar) 521 2,695 7 43Diamond 2,270 5,960 6 19
For the complete Iron Road announcement including figures, please refer to the following link:
http://www.abnnewswire.net/media/en/docs/63829-ASX-IRD-506892.pdf
Contact
Andrew Stocks
Managing Director
Iron Road Limited
Tel: +61-8-9200-6020
Mob: +61-403-226-748
Email: astocks@ironroadlimited.com.au
http://www.ironroadlimited.com.au
| ||
|