Perth, Sep 14, 2010 AEST (ABN Newswire) - Iron Road Limited (
ASX:IRD) is pleased to advise that Stage V drilling at the Central Eyre Iron Project (CEIP) is proceeding to plan.
Central Eyre Iron Project
CEIP Summary
- Three diamond rigs continue drilling on the Stage 5 drilling programme at the Murphy South target area.
- To date 36 pre-collar RC and 13 diamond holes have been completed.
Progress for Period
------------------------------------------------------------Hole Type Metres Completed (m) Holes Completed (No.) PERIOD TO DATE PERIOD TO DATE------------------------------------------------------------RC (pre-collar) 2,174 2,174 36 36------------------------------------------------------------Diamond 3,290 3,290 13 13------------------------------------------------------------
Iron Road's principal project is the Central Eyre Iron Project, South Australia. The wholly owned Central Eyre Iron Project is a collection of three iron occurrences (Warramboo, Kopi & Hambidge) with an exploration potential of 2.8-5.7 billion tonnes magnetite gneiss.
For the complete Iron Road announcement including figures, please refer to the following link:
http://www.abnnewswire.net/media/en/docs/63703-ASX-IRD-505160.pdf
Contact
Andrew Stocks
Managing Director
Iron Road Limited
Tel: +61-8-9200-6020
Mob: +61-403-226-748
Email: astocks@ironroadlimited.com.au
http://www.ironroadlimited.com.au
| ||
|