
Iron Road Limited (ASX:IRD) Updates On Warramboo 2010 Drilling Programme At Central Eyre Iron Project
Perth, Mar 22, 2010 AEST (ABN Newswire) - Iron Road Limited (
ASX:IRD) is pleased to advise that drilling at the Company's wholly owned Central Eyre Iron Project continues to proceed to plan. The Central Eyre Iron Project is a collection of three iron occurrences (Warramboo, Kopi & Hambidge) with an exploration potential of 2.8-5.7 billion tonnes magnetite gneiss*. The current programme encompasses resource expansion drilling to increase an existing JORC compliant inferred resource estimate of 110Mt at the Boo-Loo prospect located within the Warramboo Project area.
* Coffey Mining (Iron Road Limited ASX announcement 01 September 2009).
Summary
- Third batch of assays and DTR test work received - results consistent with previous.
- Diamond rigs relocated from Dolphin to drill seven additional holes at Boo-Loo West.
- 679 samples at analytical laboratory for XRF analysis and DTR test work.
Progress for Period
----------------------------------------------------------Hole Type Metres Completed(m) Holes Completed(No.)---------------------------------------------------------- PERIOD TO DATE PERIOD TO DATE -----------------------------------------RC (pre-collar) Complete 3396 Complete 49Diamond 1583 7742 9 38----------------------------------------------------------
Contact
Andrew Stocks
Managing Director
Iron Road Limited
Tel: +61-8-9200-6020
Mob: +61-403-226-748
Email: astocks@ironroadlimited.com.au
| ||
|