Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 3 March 2008 for the Period 0600 hrs 29 February 2008 to 0600 hrs 3 March 2008. Present depth as of 0600 hours, 3 March 2008 is 2152 metres. During the 72-hour period drilled ahead 8 1/2" hole from 1996m to 2095m. Pulled out of hole for a new drill bit. Pressure tested all blow out prevention equipment. Drilled ahead to 2152m @ 0600 hours, 3 March 2008. Gas Peak: 2117m, 7.8 units. Future Operations: Drill ahead to the Cattamarra reservoir objectives.
Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 29 February 2008 for the Period 0600 hrs 28 February 2008 to 0600 hrs 29 February 2008. During the 24-hour period drilled ahead 8 1/2" hole from 1913m to 1996m.
Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 28 February 2008 for the Period 0600 hrs 27 February 2008 to 0600 hrs 28 February 2008. During the 24-hour period drilled ahead 8 1/2" hole from 1801m to 1913m. Future Operations: Drill ahead to the Cattamarra reservoir objectives.
Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 27 February 2008 for the Period 0600 hrs 26 February 2008 to 0600 hrs 27 February 2008. During the 24-hour period drilled ahead 8 1/2" hole from 1630m to 1801m in the Yarragadee Formation. First reservoir objective predicted at approximately 2085 metres in the Cattamarra Coal Measures.
Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 26 February 2008 for the Period 0600 hrs 25 February 2008 to 0600 hrs 26 February 2008. During the 24-hour period drilled ahead 8 1/2" hole from 1490m to 1630m in the Yarragadee Formation. First reservoir objective predicted at approximately 2085 metres in the Cattamarra Coal Measures.
Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 25 February 2008 for the Period 0600 hrs 22 February 2008 to 0600 hrs 25 February 2008. During the 72-hour period drilled ahead 8 1/2" hole from 1199m to 1490m in the Yarragadee Formation and commenced tripping for a new drill bit at 1600 hours, 24 February 2008. At 0600 hours 25 February 2008 running in hole with a new drill bit to drill ahead in 8 1/2" hole to reservoir objectives.
Empire Oil & Gas N.L. (ASX:EGO) Drilling Progress Report dated 22 February 2008 for the Period 0600 hrs 21 February 2008 to 0600 hrs 22 February 2008.
Please find attached the Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report for the Period 0600 hrs 20 February 2008 to 0600 hrs 21 February 2008.
During the 24-hour period drilled out 9 5/8" shoe at 614m, conducted formation integrity test and drilled ahead 8 1/2" hole from casing shoe to 680m in the Yarragadee Formation.
Empire Oil & Gas N.L. (ASX: EGO) - MORIARY-1, EP 426, NORTH PERTH BASIN, WESTERN AUSTRALIA - for the Period 0600 hrs 14 February 2008 to 0600 hrs 15 February 2008.