

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the Star Finch-1 well commenced drilling (spudded) at 0600 hours on 8 July, 2008 upon drilling out the 13 3/8" conductor set at a depth of 19 metres. The current operations at 0900 hours on 8 July 2008 is drilling ahead in 311mm (12 1/4") hole at 27 metres depth. Planned operations in the next 24 hours, will be drilling ahead in 12 1/4" hole.
ARC as the operator of the EP104/R1 Joint Venture have advised Empire Oil & Gas NL (ASX:EGO)(PINK:EOLGF) that it has undertaken well inspection operations at the Stokes Bay-1 well to assist in the design of the definitive testing program.
DETAILS OF THE EMPIRE OIL & GAS N.L. SHARE PURCHASE PLAN - CLOSURE OF THE OFFER, 4 JULY 2008 AND ALLOTMENT.
Please find the Notice that is to be sent to all Shareholders providing advice that the current Empire Oil and Gas NL (ASX:EGO)(PINK:EOLGF), Share Purchase Plan will close on 4 July 2008.
Empire Oil & Gas N.L. (ASX:EGO)(PINK:EOLGF) is pleased to provide an update of the drilling of the Star Finch-1 well located near Carnarvon, Western Australia.
Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce an update of the planned drilling of the Gingin West No.1 well on a well location being defined by the April 2008 3D Seismic and a summary of additional gas prospects and leads including the Gingin gasfield, EP 389, onshore Perth Basin, Western Australia.
The Star Finch-1 well is scheduled to be drilled in EP 460 in June 2008 followed by the Lake MacLeod-1 well in EP 461/EP 439 in July 2008 with Government and other approvals to also drill an Appraisal well, Star Finch-2, on a Star Finch-1 discovery.
Empire Oil & Gas N.L. (ASX:EGO)(PINK:EOLGF) is pleased to announce that the Gingin West 3D Seismic Survey of approximately 45km2 in Petroleum Exploration Permit EP 389 was completed on 3 May 2008.
Empire Oil & Gas NL (ASX:EGO)(PINK:EOLGF) Announce the Quarterly Report for the period ended 31 March, 2008.
Empire Oil & Gas N.L. is pleased to announce that the Mullering 3D Seismic Survey of 50 km2 in Petroleum Exploration Permit EP 432, North Perth Basin was completed on 24 April 2008.